Contemporary Energy Solutions

[vc_row][vc_column width=”2/3″][mk_image_slideshow images=”409,410,408″ image_width=”700″ image_height=”483″][/vc_column][vc_column width=”1/3″][vc_column_text]Meco Corporation – Greeneville, TN

Project Scope:
Meco Corporation replaced a legacy lighting system consisting of (1,484) Metal Halide and T12 fixtures with (1,345) T8 fixtures. Motion control was also added to warehouse and storage areas to further reduce Meco Corporations energy consumption.
Annual Savings:
Energy Savings $118k
Displaced Energy 1.2 million kWh
Displaced Capacity 388 kW
Payback Period 0.62
Pre-Tax ROI 161%
Impact:
CO2 Reduction 801 tons/year
Acres of Trees Planted 227/year
Gallons of Gas Saved 102,393/year[/vc_column_text][mk_button dimension=”two” size=”large” url=”http://testinghotep.wpengine.com/wp-content/uploads/2015/12/Meco-Corporation-Case-Study-CES.pdf” target=”_blank”]Download PDF[/mk_button][/vc_column][/vc_row]

Related Projects