Project Scope:
Replace legacy lighting system consisting of Metal Halide, High Intensity Discharge Wall Pack, and T12 Fluorescent fixtures with Orion’s T8 Fluorescent Compact Modular Enclosed High Bay, T5 Enclosed Exterior and T8 Conversion Kit Series fixtures.
Annual Savings:
Energy Savings $75,200
Displaced Energy 800,650 kWh
Displaced Capacity 99.73 kW
Light Level Improvement: 193.8%
(30.9 to 90.8 avg. fc)
Impact:
CO2 Reduction 487 tons/year
Acres of Trees Planted 147/year[/vc_column_text][mk_button dimension=”two” size=”large” url=”http://testinghotep.wpengine.com/wp-content/uploads/2015/12/Vestal-Manufacturing-Sweetwater-TN-CES.pdf” target=”_blank”]Download PDF[/mk_button][/vc_column][/vc_row]